{"id":8801,"date":"2018-01-16T17:12:25","date_gmt":"2018-01-17T01:12:25","guid":{"rendered":"http:\/\/srrttf.org\/?p=8801"},"modified":"2018-01-31T15:16:56","modified_gmt":"2018-01-31T23:16:56","slug":"january-24-2018-spokane-river-regional-toxics-task-force-meeting","status":"publish","type":"post","link":"https:\/\/srrttf.org\/?p=8801","title":{"rendered":"January 24, 2018 Spokane River Regional Toxics Task Force Meeting"},"content":{"rendered":"<h2>The next meeting of the\u00a0Spokane River Regional Toxics\u00a0Task Force is:<\/h2>\n<p><strong>Date:<\/strong>\u00a0January 24, 2018<br \/>\n<strong>Time:<\/strong>\u00a0<span style=\"background-color: #ffff00;\">8:30 a.m. to 12:00 pm<\/span><strong><br \/>\nLocation:<\/strong>\u00a0Spokane County Water Resource Center<br \/>\n1004 N. Freya Street<br \/>\nSpokane, WA 99202<\/p>\n<p><a href=\"http:\/\/maps.google.com\/maps?q=1004+North+Freya+Street,+Spokane,+WA&amp;hl=en&amp;sll=47.272986,-120.882277&amp;sspn=5.195698,9.84375&amp;oq=1004+North+Freya&amp;hnear=1004+N+Freya+St,+Spokane,+Washington+99202&amp;t=m&amp;z=16\">Click here<\/a>\u00a0for a map<\/p>\n<p><strong>To attend the meeting by phone:<\/strong><br \/>\n(509)335-2277, ID\u00a05230244<\/p>\n<p><strong>Meeting Materials to review prior to the meeting:<\/strong><br \/>\n<strong><em>Meeting agenda:<\/em><br \/>\n&#8211;\u00a0<a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/SRRTTF-January-24_2018-agenda_for-printing.pdf\">SRRTTF January 24_2018 agenda_(V2)<\/a><a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/SRRTTF-January-24_2018-agenda_draft-1.pdf\"><br \/>\n<\/a><\/strong><strong><br \/>\n<em>Previous Meeting Summaries &#8211;<u>Decision<\/u>: Accept 11\/29\/17 Meeting Notes? (5 min agenda topic)<\/em><br \/>\n&#8211;\u00a0\u00a0<a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/SRRTTF-11.29.17-DRAFT.pdf\">SRRTTF 11.29.17 Meeting Summary DRAFT (DECISION ITEM)<\/a><br \/>\n&#8211;\u00a0\u00a0<\/strong><a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/TTWG-01-03-18-mtg.notes_.pdf\">TTWG 01-03-18 mtg.notes (REVIEW ITEM)<\/a><\/p>\n<p><em><strong>ACE\u00a0 Commitment reports: (Informational- short agenda topic)<\/strong><\/em><br \/>\n<strong>&#8211;<\/strong>\u00a0\u00a0<a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/Ace-commitment-report-2017-through-4th-quarter.pdf\">Ace commitment report 2017 through 4th quarter<\/a><br \/>\n<strong>&#8211;<\/strong>\u00a0\u00a0<a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/ACE-Commitment-report-December-31_2017.pdf\">ACE Commitment report December 31_2017<br \/>\n<\/a><em><strong>&#8211;\u00a0\u00a0<\/strong><\/em><a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/Ecology-ACE-Contract-for-07-01-17-to-06-30-19.pdf\">Ecology-ACE Contract for 07-01-17 to 06-30-19<br \/>\n<\/a><em><strong><br \/>\nComp Plan implementation projects\u2014<u>Decision<\/u>: authorize ACE to develop detailed scopes\/schedules based on conceptual scopes?<\/strong><\/em><a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/ACE-Commitment-report-December-31_2017.pdf\"><br \/>\n<\/a><strong>&#8211;<\/strong>\u00a0 <a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/ACE-contract-C1800094-project-planning2.xlsx\">ACE contract #C1800094 project planning2 <\/a>(<em>Project tracking: master table + ACE-Ecology spreadsheet)<br \/>\n<\/em><strong>&#8211;<\/strong>\u00a0\u00a0<a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/Project-Management-Process-01-02-18.docx\">Project Management Process 01-02-18<\/a>\u00a0word doc (guideline for project leads);\u00a0<a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/Project-Management-Process-01-02-18.-reviewed.pdf\">Project Management Process 01-02-18. reviewed<\/a>\u00a0(pdf)<br \/>\n<strong>&#8211;\u00a0\u00a0<a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/High-level-scope-of-work-GW-upgradient-of-Kaiser.pdf\">High level scope of work GW upgradient of Kaiser<\/a><\/strong><br \/>\n<em><strong>&#8211;\u00a0<\/strong><\/em><strong>\u00a0<\/strong><strong><a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/High-level-sow_PCB-mass-balance-in-river-reaches-Plantes-Ferry-to-Nine-Mile.pdf\">High level sow_PCB mass balance in river reaches Plantes Ferry to Nine Mile<br \/>\n<\/a><\/strong><em><strong>&#8211;\u00a0\u00a0<\/strong><\/em><strong><a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/Ideas-for-possible-projects-from-EO-team-1-16-18_.pdf\">High Level Conceptual Scope of Work Education and Outreach team 1-16-18<br \/>\n<\/a>&#8211;\u00a0\u00a0<a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/Regional-PMF-Analysis.pdf\">Regional PMF Analysis<\/a><\/strong><a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/Regional-PMF-Analysis.pdf\"><br \/>\n<\/a> &#8211;\u00a0<a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/3.GreenChem-ideas.pdf\">Green Chem ideas<\/a>\u00a0(Posted late &#8211; Monday 1.22.18 &#8211; for discussion)<br \/>\n&#8211; <a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/Product-Testing-budget-proposals-1.pdf\">Product Testing budget ideas<\/a>\u00a0; <a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/Bio-based-ice-control-article.pdf\">Bio-based ice control article<\/a>\u00a0(Posted late &#8211; Monday 1.22.18 &#8211; for discussion)<strong><br \/>\n<\/strong><\/p>\n<p><strong>MOA &amp; Collaboration: <em><u>Purpose:<\/u><\/em><\/strong><em><strong> address issues related to SRRTTF MOA<\/strong><br \/>\n&#8211;\u00a0\u00a0<strong><a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/SRRTTF-MOA-key-guidelines_highlighted.pdf\">SRRTTF MOA key guidelines_highlighted<\/a><\/strong><\/em><a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/SRRTTF-MOA-communications-protocols.pdf\"><br \/>\n<\/a><em>For more information on the Task Force MOA and Previous MOA workgroup unapproved revisions go to:<br \/>\n&#8211;<\/em>\u00a0 <a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2012\/10\/OB5A38-compressed.pdf\">TASK Force MOA (approved MOA)<br \/>\n<\/a>&#8211;\u00a0 <a href=\"http:\/\/srrttf.org\/?page_id=3824\">MOA Work Group work in 2015 (note, revisions were put on hold in 2015)<\/a><\/p>\n<p><strong>Comp Plan Implementation Review Summary (IRS)<em>\u2014<u>Purpose:<\/u> Fulfill Comp Plan condition\u2014<u>Decision<\/u>: accept IRS for the record?<br \/>\n<\/em>&#8211;<\/strong>\u00a0<strong><a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/Comp-Plan-Impl.Review-Summary.pdf\">Comp Plan Impl.Review Summary<\/a>\u00a0(DECISION ITEM)<\/strong><\/p>\n<p>For review before the February Task Force Meeting (IRS addendum), consider adding the following addendum to the IRS.<br \/>\n<strong>&#8211;\u00a0<\/strong>\u00a0<a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/Impl.Review.Summary_Addenda-summaries-from-technical-advisor-facilitator-workgroups.docx\">Implementation Review Summary_Addenda&#8211;summaries from technical advisor, facilitator, and workgroups<\/a><\/p>\n<p><strong>Phase 2 Funding for Fungi \u201cEmerging Stormwater Technologies\u201d<em> \u2014<u>Purpose:<\/u> Comp<\/em><\/strong><em><strong>\u00a0Plan Implementation\u2014<u>Decision<\/u>: allocate $15K for Phase 2 of fungi PCB remediation project?<\/strong><br \/>\n<strong>&#8211;<\/strong>\u00a0\u00a0<\/em><strong><a href=\"http:\/\/srrttf.org\/wp-content\/uploads\/2018\/01\/The-Lands-Council-Proposal-for-Phase-2-Fungi-PCB-project.pdf\">The Lands Council Proposal for Phase 2 Fungi-PCB project<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The next meeting of the\u00a0Spokane River Regional Toxics\u00a0Task Force is: Date:\u00a0January 24, 2018 Time:\u00a08:30 a.m. to 12:00 pm Location:\u00a0Spokane County Water Resource Center 1004 N. Freya Street Spokane, WA 99202 Click here\u00a0for a map To attend the meeting by phone: &hellip; <a href=\"https:\/\/srrttf.org\/?p=8801\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[87,1,69],"tags":[135,213,15,211,17,27],"class_list":["post-8801","post","type-post","status-publish","format-standard","hentry","category-announcement","category-meetings","category-task-force","tag-comprehensive-plan","tag-implementation-review-summary","tag-moa","tag-scope-of-work","tag-technical-consultant","tag-the-lands-council"],"_links":{"self":[{"href":"https:\/\/srrttf.org\/index.php?rest_route=\/wp\/v2\/posts\/8801","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/srrttf.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/srrttf.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/srrttf.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/srrttf.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8801"}],"version-history":[{"count":25,"href":"https:\/\/srrttf.org\/index.php?rest_route=\/wp\/v2\/posts\/8801\/revisions"}],"predecessor-version":[{"id":8888,"href":"https:\/\/srrttf.org\/index.php?rest_route=\/wp\/v2\/posts\/8801\/revisions\/8888"}],"wp:attachment":[{"href":"https:\/\/srrttf.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/srrttf.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/srrttf.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}