Task Force Response Letter to the WA Department of Ecology Draft General Hatchery Permit: Revised Timeline

The Washington Department of Ecology has given an extension on the the comment period for the General Hatchery Permit Draft. Therefore the timeline for revising, commenting and making a decision on the final comment letter has been revised from what was discussed at the September 23 Task Force Meeting.

Key Points: New Hatchery Permit Comment letter key points 9-24

The revised timeline and process is as follows:

  • Draft letter from Lisa Dally-Wilson to small work group (BiJay Adams, Galen Buterbaugh, John Beacham) Monday September 28th
  • Small work group comments to Lisa Dally-Wilson by C.O.B on Tuesday, September 29th
  • Final letter out for posting by 4:00 pm on Wednesday, September 30 with request for approval in one week at the Technical Track Work Group Meeting.
  • Ruckelshaus to incorporate any substantive comments from Task Force members to the letter between September 30 and October 6. 
  • Final Decision on the letter will be made at the Technical Track Work Group Meeting scheduled for Wednesday October 7, from 10:00 am – 12:00 pm at the Department of Ecology in Spokane. This will be an official Task Force meeting.  In order to make this decision there will need to be a quorum of voting members present either in person or on the phone for this meeting.  (a minimum of 7 out of 12 voting members). 
    • Department of Ecology: 4601 North Monroe Street, Spokane, WA
    • To Dial in: Call In Number: 800-704-9804, Participant Code: 34863442#
  • Final Comment letter to Ecology on Thursday October 8th!

Final Letter submitted to Ecology on 10/8/15 : SRRTTF comments on Ecology General Hatchery Permit_ 10-08-15

 

September 23, 2015 Spokane River Regional Toxics Task Force Meeting

The next meeting of the Spokane River Regional Toxics Task Force is:

Date: September 23, 2015
Time: 9:00 a.m. to 12:30 p.m.

Location: Spokane County Water Resource Center
1004 N. Freya Street
Spokane, WA 99202

Click here for a map


Presentations from Michael Friese and Dave Dilks will be available as a webinar during the meeting. If you would like to view the presentations:

For Webinar:

1. Go to https://wadis.webex.com/wadis/j.php?MTID=mb9c773c8ef35f566edb246d98360d68d 
2. Enter your name and email address. 
3. Enter the meeting password: Srrttf09232015 
4. Click “Join Now”. 
5. Follow the instructions that appear on your screen. 
——————————————————- 
For Audio:

Call In Number: 800-704-9804
Participant Code: 34863442#


At this meeting the Task Force will discuss, and potentially make a decision on, a draft comment letter on the WA Department of Ecology’s Draft Hatchery General Permit. Kris Holm (City of Coeur d’Alene) has drafted a letter emphasizing the points discussed at the last Task Force meeting. SRRTTF members are asked to send any content-based comments to Chris Page (c.page@wsu.edu) PRIOR to the September 23rd Task Force meeting. Chris will summarize comments received. It may be necessary to hold another Task Force meeting via phone after the September 23rd meeting to approve a final letter, if substantial comments are received that do not get satisfactorily resolved on the 23rd.

Also note that the full Phase 2 Report on the 2014 dry weather sampling (with appendices) from Limnotech has been posted here on the Task Force website.

Meeting Documents:
–  SRRTTF 9.23.15 Meeting Summary Notes_Final
–  SRRTTF Sept 23 2015 Agenda_DRAFT
–  SRRTTF 09-03-15_Meeting Notes_DRAFT
–  SRRTTF TTWG 09-02-15 meeting summary DRAFT
–  Hydroseed Pilot Project Report_Draft_082715
–  2015 9 11 REPORT Vactor Decant Facility Characterization FINAL
–  CDA SRRTTF draft FHGP Comment Letter -Draft Permit
 Quick guide to commenting on hatchery permit_Mike Hepp
–  Little Spokane River- PCB in Fish Tissue Verification Study_Michael Friese EAP Presentation
–  SRRTTF_ComprehensivePlan_WorkPlan_2015_0923_draft
 Presentation: SRRTTF_DraftWorkPlan_2015_09_23
  EAP project summaries

Vactor Waste Study Report available for review: Comments due by September 10th

The Task Force Vactor Waste small work group has completed a draft report on the recent Vactor Waste/Decant Facility study.  Task Force members are asked to review the report and provide feedback to Jeff Donovan (jdonovan@spokanecity.org) by 5 pm on September 10th.

2015 7 15 REPORT Vactor Decant Facility Characterization DRAFT

September 3, 2015 Spokane River Regional Toxics Task Force Meeting

The next meeting of the Spokane River Regional Toxics Task Force is:

Date: Thursday, September 3, 2015
Time: 9:00 a.m. to 12:30 p.m.

Location: Liberty Lake Sewer & Water District Office
22510 E. Mission Avenue Liberty Lake, WA 99019
Click here for a map

Steve Krueger’s presentation on the “Best Value Bid Weighting Calculator”
To join the presentation from your computer, tablet or smartphone, please go to

1. Go to https://wadis.webex.com/wadis/j.php?MTID=m2bad9b0071df8644b2ac7925d8e0df4c
2. Enter your name and email address.

3. Enter the meeting password: SRTTFSept03

4. Click “Join Now”.

For Audio:

Call In Number: 800-704-9804
Participant Code: 34863442#

Meeting Documents:
–  SRRTTF-09-03-15_Meeting-Notes_Edited 9.23.15.
 SRRTTF Sept 3 2015 Agenda_draft V2
 SRRTTF Meeting July 29 2015 Summary Notes
 Letter to EPA regarding Comp Plan content review initiation 08-18-15
 SRRTTF_Phase_2_Final_Report_2015_08_12_without appendices
  CDA Fish Hatchery Permit Response Talking Points draft
  Hydroseed Pilot Project Report_Draft_08-27-15
–  Spokane River Water Quality Survey Selected Results Presentation _Marlene Feist

September 2, 2015 Technical Track Work Group Meeting

The next meeting of the Technical Track Work group is:
Date: Wednesday September 2, 2015
Time: 10:00 a.m. to 12:00 p.m.

Location: Washington Department of Ecology
N. 4601 Monroe St.
Spokane, WA 99205
Click here for a map.

Call In Number: 800-704-9804 Participant Code: 34863442#

Meeting Documents:
–  SRRTTF TTWG 9.2.15 Summary Notes
 Tech Track WG agn 09-02-15 DRAFT
 SRRTTF 08-05-15 TTWG summary notes DRAFT
 SRRTTF_Phase_2_Final_Report_2015_08_12_without appendices
Dry Weather Sampling 2015
 Spokane_River_QAPP_Addendum 1_signed_081715
 QAPP checklist 2015 Addendum 1 SRT Reduction Strategy APPROVED (1)
Comprehensive Plan
 SRRTTFComprehensivePlanOutline_2015_09_02
 Comp Plan Outline 08-2015 (excel spreadsheet)
  Letter to EPA regarding Comp Plan content review initiation 08-18-15 DRAFT
SWAT Team Projects/Reports
–  
2015 8 14 REPORT Vactor Decant Facility Characterization DRAFT
–  
Hydroseed Pilot Project Report_Draft_08-27-15
–  Hydroseed Results with Graphs etc

Upland Fin-Fish Hatching and Rearing General NPDES Permit Draft available or review and comment

The Upland Fin-Fish Hatching and Rearing General Permit (Hatchery Permit) is now available for review and comment.  The public notice can be viewed here.  To review the permit and for information on public hearings and comment period please go to the Department of Ecology website.

The Task Force will be putting together a response to the Draft permit over the next few weeks. If you have any comments/suggestions that you would like included in the response letter, please send them to Kara Whitman (kmwhitman@wsu.edu) as soon as possible.